Status: Completed
Project: Supply and Installation of 11/0.4 KV, 500 KVA 9 Position OLTC PSS Transformer with Complete set and Structures
Location: Kathmandu Upatyaka Khanepani Limited,
Sundarijal Water Treatment Branch
Job Description:
Supply of 4 Way Incomer Interlock Automatic Panel which include FP EDO Type ACB.
Sample units were carried out routine tests as per the relevant IEC standards and the routine test reports was made
available at the time of inspection to
NEEK representative: Mr. Bishesh Bhattrai,
NEA representative: Mr. Sarbagya Pradhan
Routine test included:
1. Visual Inspection
2. Inspection of wiring and electrical operation
3. Verification of insulation
4. Verification of protective measures and continuity of protective circuits
5. Verification of insulation resistance